WE Energies

Wisconsin Utility Interconnection & net metering rules
Net Metering Allowed1
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
1
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Tap Criteria

Any Line Side Tap must Note "DUAL SOURCE" above Utility Meter.

Note: Dual Gang meter taps no longer required in WE Energies

Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Utility Specific Adjustments

PV Meter no longer required.

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Labeling
N/A

Plans & docs

Site Plan Reqs
  • Disconnect must be on same building as utility meter.
  • Call out Utility Meter, MSP, Fused AC Disconnect and Inverter.
  • Legend labels alone are insufficient.
  • Show street name.
  • If a project includes PV Solar AND a Tesla Powerwall, the project's DC size will be the sum of panels and Tesla Powerwall. For example, if panels put out 4.5kW and a Tesla Powerwall puts out 5kW, the DC size on the SITE PLAN and LINE DIAGRAM should be 9.5kW.
SLD Reqs

UTILIZE CHECKLIST FOR ALL PROJECTS ---> CHECKLIST

example project----> EXAMPLE

ALL REVISIONS ON TLD NEED TO BE HIGHLIGHTED IN YELLOW

Battery

  • UTILIZE LINE DIAGRAM 3 FROM THE FILES SECTION
  • If a project includes PV Solar AND a Tesla Powerwall, the project's DC size will be the sum of panels and Tesla Powerwall. For example, if panels put out 4.5kW and a Tesla Powerwall puts out 5kW, the DC size on the SITE PLAN and LINE DIAGRAM should be 9.5kW.
  • If Multiple Inverters, circuit into exterior Gen panel with battery backfeeds and feed into one Check Meter then into Gateway Gen Lugs.
Electric Service Reqs


Install Reqs


Placards


Equipment Approvals
Other
Electrical Diagram Notes

All Jobs [The external disconnect shall provide a visible open between its contacts, have the ability to be locked in the open position and have 24/7 ready access for utility workers // CGS-NM rate // METER TO BE LABELED DUAL-SOURCE]

PV ONLY ADD NOTE -----> WE ENERGIES ONE LINE DIAGRAM B1

BATTERY UNDER GROUND ADD NOTE ---> WE ENERGIES ONE LINE DIAGRAM U3

BATTERY OVERHEAD ADD NOTE ---> WE ENERGIES ONE LINE DIAGRAM O3

Website
link
Phone
(800) 242-9137

Other details

Restrict Inspection
1
Revision Required
1
Address ID
163732
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with WE Energies before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.