Rock Energy Cooperative (WI)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Excess demand produced by the member at the time of coincidental peak shall be credited back to the member at a rate of 90% of the above listed Coincidental Demand charge. Accrued demand credits shall be made payable at the earliest of (a) the end of the current calendar year, or; (b) thedate that the member terminates service under this rider
Coincidental Demand charge = $22.60/kW/month
- Rebates Offered
- 1
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
• System capacity must be 0.5 kWDC or greater.
• System must be installed within 90 degrees of due south. (Azimuth)
• Must be installed with a panel tilt between 10-50 degrees.
• Must have less than 10 percent obstacle shading based on analysis of an industry-accepted tool.
- SLD Reqs
Does not allow us to make connections in the meter can.
2 Non-fusible 60A disconnects are required by the utility if the first dsco is not within 10' of the utility meter
- Website
- link
- Phone
- (608) 752-4550
Other details
- Restrict Inspection
- 0
- Address ID
- 176780
- Express Planset Eligible
- Yes