Jackson Electric Cooperative
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Systems 20 kW and less will be net metered monthly where the production will offset the consumption and any excess production will be banked to the next month. The true up month is June usage. Any excess production at that time will be paid at Dairyland Power's average wholesale avoided cost.
- Rebates Offered
- 0
Interconnection & taps
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Other details
- Express Planset Eligible
- Yes