Peninsula Light Company
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the electricity generated by the Member and distributed back to PLC during the billing period, exceeds the electricity supplied by PLC, then the Member shall be credited for the net excess kilowatt-hours generated during the billing period, with this kilowatt-hour credit appearing on Member’s bill. At the end of the 12 months, unused kWh will be granted to PLC with no compensation to the customer
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Interconnecting generating facilities under 100 kW may require a separate transformer. If PLC requires a dedicated distribution transformer, the Applicant or Generator shall pay for all costs of the new transformer and related facilities
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Electric Service Reqs
AC Disconnect Required
- Applicant shall furnish and install on Applicant’s side of the meter, a UL-approved safety disconnect switch which shall be capable of fully disconnecting the Applicant's Generating Facility from PLC’s Electric System. The disconnect switch shall be accessible on the exterior of the building and shall be of the visible break type in a metal enclosure which can be secured by a padlock. The disconnect switch shall be accessible to PLC personnel at all times.
Production Meter Required
- Must install an appropriate meter base on the Generating Facility for the installation of a Production Meter by PLC as part of the interconnection set-up of the Generating Facility.
- Placards
Common labeling furnished or approved by PLC and in accordance with NEC requirements must be posted on meter base, disconnects, and transformers informing working personnel that generation is operating at or is located on the premises.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 4255061
- Express Planset Eligible
- No