Modern Electric Water Company
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Credits are given at the same retail rate (1-for-1 exchange ratio) under which the customer receives service from the utility, and can be used in subsequent billing cycles up to the forfeiture date (March 31st) each year.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- Yes
System size & offset
- System Size Restrictions
- 100
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- No
- System Offset Notes
Maximum of 100 kW AC
- Preferred by the utility: 100% offset of the historical usage
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Rate Schedule Link
- link
- Website
- link
- Phone
- (509) 928-4540
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes