Cowlitz County Public Utility District
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the electricity generated by the customer and distributed back to the District during the billing period exceeds the electricity supplied by the District, then the customer shall be billed for the appropriate customer service charge as other customers of the District in the same rate schedule and credited for the net excess kilowatt-hours generated during the billing period, with this kilowatt-hour credit appearing on customer’s bill for the following billing period. On March 31st each year, any remaining kWh credits will be awarded to the utility without any compensation to the customer.
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Not Required for Interconnection Submittal
- SLD Reqs
Standard
- Electric Service Reqs
- AC Disconnect is required and must be adjacent to the utility company meters.
- Production Meter Socket Required
- Placards
- 2020 NEC labeling is required on the plans, and installed at the site per NEC requirements. Must be posted on the meter base, disconnects and transformers informing working personnel that a PV system is operating at the premise.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Label Page Notes
2020 NEC
- Electrical Diagram Notes
- Order of equipment on ELD = Inverter > Disco > PM > POI
- Rate Schedule Link
- link
- Website
- link
- Phone
- (360) 501-9546
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 0
- Address ID
- 3842189
- Express Planset Eligible
- No