City of Sumas

Washington Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
TOU Utility
No
Post Solar Billing Method
Non-export
Net Excess Generation Notes

If you use more energy than you generate in a given billing cycle, you would be a “net Consumer,” and the net consumption would appear as a charge on the current bill. If your meter ran backward more than forward in a given billing cycle, you would be a “net generator” for that billing cycle, and the NEG would appear as a credit on your next bill. An annual request, by December 20th of each year, may be made for payment of a credit balance. Refund of a credit balance will be at two-thirds of the applicable retail rate.

Rebates Offered
No
Deregulated
Yes
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The generating system must not exceed 25 kilowatts of peak AC power output.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Standard (utility does not offer examples)

SLD Reqs

Standard (utility does not offer examples)

Electric Service Reqs

National Electrical Code (Articles 690 and 705), the Institute of Electrical and Electronics Engineers (IEEE), and Underwriters Laboratories (UL), and any applicable state and local agencies

Install Reqs

Utility requires 24/7 access to the premises/equipment

Placards

Utility did not provide any placard/labeling examples.

Electrical Stamp Required
No
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(360) 988-5711
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Sumas before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.