Avista Utilities (WA)

Washington Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Any net excess generation (NEG) during a monthly billing period is credited to the customer's next bill at the utility's retail rate. At the beginning of each calendar year, any remaining NEG is granted to the utility with no compensation for the customer.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
100
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Net metering limit is 100 kW.

The intent of Net Metering is to offset usage, any bank (overage of generation kwh) is reset annually on 3/31. There is no compensation for any generation lost during the reset.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Process

TDR Process Work is performed Monday - Friday 7:00am - 3:30pm. We require a minimum of 2 business days notification, but not more than 2 weeks. Customer Service can schedule an appointment window for you. We only drop service if someone is on-site and available for work. Reconnects are also done during normal business hours. If work is being done on the electrical panel, the Serviceman will need to see proof of electrical permits before he drops the service. There is no cost for a service drop/reconnect. Customer Service can be reached at .

TDR - Who to Contact - Customer Service

TDR - Applications/Documents Req - N/A

TDR - ETA of notice required for request - 2 business days

TDR - Who can schedule? - Does not matter

TDR - ETA of Utility Scheduling TDR - N/A

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • If possible, please install the the AC disco next to the utility meter (within 10 feet).
  • If not possible, please ensure that the placard map is installed in the utility meter to show the location of the AC disconnect. (Please include the proposed Placard Map in the PV Plans)
SLD Reqs

PM can be installed at customer request, but is not required.

Placards


Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
283353
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Avista Utilities (WA) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.