City of Manassas Utilities
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the power output (kW) of the customer generation exceeds the load (kW) of the customer premises at any time during a billing cycle, the resulting energy (kWh) returning to the City’s system will be netted against the energy (kWh) consumed by the customer during that same billing cycle. If during a billing cycle the netted amount is a credit, this energy will be carried forward and applied to the usage in the next billing cycle. If no energy is used or the net result is a credit, the customer will pay the Customer Charge for the billing period.
- Rebates Offered
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
Plans & docs
- Site Plan Reqs
- The City requires a manual, lockable, load break utility-interface disconnect switch between the output of the photovoltaic inverter and the Customer’s wiring connected to the City’s electric distribution system. The load break device shall be both visible and accessible to the City’s employees.
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (703) 257-8200
Other details
- Mod Swap Requires Planset
- 1
- Address ID
- 1249103
- Express Planset Eligible
- Yes