APCo - Appalachian Power (WV)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 1
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The electric utility shall credit a Customer-generator at the full retail rate, or the net metering credit approved by the Commission in a general rate filing, for each kW hour produced by an alternative or renewable energy resource installed on the Customer-generator side of the electric meter and delivered to the electric utility’s distribution system through the Customer-generator’s electric meter, up to the total amount of electricity delivered by the electric utility to that Customer-generator during the billing period.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The capacity of any generator is further limited to an annual energy output no greater than the customer's previous 12 months' electrical energy consumption
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
** This is required on every project for the utility to provide the PM Socket equipment. Must be done in conjunction with the installation **
B. Installer contacts the AEP Contact Center at to:
- 1. Place a disconnect/reconnect order and receives two work order numbers and list of locations to pick up meter
- 2. If no disconnect/reconnect is needed, contact the to receive a work order
C. AEP contacts installer to schedule date/time for disconnect/reconnect
D. Installer takes the work request number to a preapproved hardware store to pick-up meter base
E. Installer begins installation of system
F. AEP performs the disconnect at the scheduled disconnect time
G. Installer performs electrical work
H. Local Electrical Inspector performs inspection
I. AEP performs the reconnect and puts cover on the meter base at the scheduled time
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
See Site Plan Sample
- SLD Reqs
- See SLD Sample
- Production meter REQUIRED
- The system needs to have one single point of disconnect that will be able to shut down the entire system, including batteries
- Equipment cannot run directly into the main meter
Battery
- System needs to have one single point of disconnect that will be able to shut down entire system, including batteries.
Existing Systems
- System may only have one single point of disconnect, existing systems will need to be combined before the POI.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (800) 956-4237
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 629488
- Express Planset Eligible
- Yes