Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Payson City - Power and Light Department

Utah Utility Interconnection & net metering rules
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Rebates Offered
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Refer to AHJ Database

SLD Reqs

For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20

Electric Service Reqs

Stand-alone meters must receive an MPU in Utah

AC Disconnect:

Applicant shall furnish and install on applicant’s side of the meter, a UL- approved safety disconnect switch which shall be capable of fully disconnecting the applicant’s generating facility from the utility’s electric system. The disconnect switch shall be located adjacent to utility meters and shall be of the visible break type in a metal enclosure which can be secured by a padlock. The disconnect switch shall be accessible to utility personnel at all times.

Nominal voltage and phase configuration of applicant’s generating facility must be compatible to the utility system at the point of common coupling.

Placards

Refer to AHJ standards

Label Page Notes

Reference Utah Labels block

Rate Schedule Link
link
Website
link
Phone
(801) 465-5217

Other details

Restrict Inspection
0
Address ID
108123
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Payson City - Power and Light Department before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.