Murray City Power

Utah Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The Customer’s account shall be credited for the net excess kilowatt-hours generated during the billing period, with this kWh credit appearing on Customer’s bill for the following billing period. Credits on the Customer’s

account may only be applied toward kilowatt-hour usage, not toward customer service charges. The Customer further agrees that any and all of the kilowatt-hour electric energy credit(s) remaining on the account at the time of the Customer’s April billing each year shall be set to zero, without further liability to the City.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0
System Offset Notes

100% offset or 10 kW DC max for Residential (whichever is LESS)

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
AC Disconnect Required
Yes
Meter Spot Process

Temporary Disconnect Reconnect Process (TDR) No requirements just call a day or two ahead of time.

TDR - Who to Contact staff

TDR - Applications/Documents Req No

TDR - ETA of notice required for request 48 hours

TDR - Who can schedule? Does not matter

TDR - ETA of Utility Scheduling TDR N/A

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Must include all equipment necessary to meet applicable safety, power quality, and interconnection requirements established by the latest revisions of NEC, IEEE, UL, and any applicable local and state agencies.

Install Reqs

"The City will install and maintain a revenue meter capable of registering the bi-directional flow of electricity at

the Customer's premises at a level of accuracy that meets all applicable standards, regulations

and statutes (Customer may, at its option, pay the additional costs for the City to install a dual registering

meter capable of separately measuring and recording both delivered and received

kilowatt-hours). Any meters installed on the Customer’s premises shall remain the property of the City."

Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Label Page Notes

Reference Utah Labels block

Website
link

Other details

Restrict Inspection
0
Mod Swap Requires Planset
1
Address ID
287173
Express Planset Eligible
No