Manti City

Utah Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Meters are read at then end of each month and the customer is either charged for or credited the difference. If there is a positive difference, a monetary credit will be given which will roll over month-to-month. Accounts are settled in April of each year.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

A customer-owned generation facility and net metering system, with a generating capacity of not more than twenty-five kilowatts aggregated at the service interconnection point, in parallel with Manti City's electrical system.

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Production meter is not required.

Generator (PV Panels, Wind Turbine, Hydro Turbine, etc.) - Include manufacturer, part number, nameplate maximum capacity (kW), and physical location. For modular systems (e.g. pv panels), also include: number of modules, configuration, nameplate maximum capacity of each module, and total nameplate maximum capacity.

Inverter - include manufacturer, type of series, part number, nameplate maximum capacity (kW), output voltage, physical location.

Disconnect Switch - Include the physical location relative to the Manti City Service Meter.

Electrical Service Panel - Include the panel or main breaker size and the position at which the generation is connected. Show all panels (if there are multiple panels or subpanels) even if not directly connected into the generation system.

Manti City Service Meter - Include existing meter serial number, meter form and class.

Other Related Equipment (battery banks, transfer or bypass switches, backup generators, etc.).

Install Reqs

Production meter is not required.

Customer shall furnish and install on customer's side of the meter, a UL-approved safety disconnect switch which shall be capable of fully disconnecting the Customer's generating facility from Manti City's electric system. The disconnect switch shall be located adjacent to Manti City's meters and shall be of the visible break type in a metal enclosure which can be secured by a padlock. The disconnect switch shall be accessible to Manti City personnel at all times.

Placards

Meter and transformer of transformer pole serving the Customer Generator shall be labeled to indicate potential electric current feedback. Manti City will provide and install labels when Customer-Generator's electrical system is approved for interconnection.

Equipment Approvals
California Energy Commission
Label Page Notes

Reference Utah Labels block

Website
link
Phone
(435) 835-2401

Other details

Restrict Inspection
0
Address ID
651542
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Manti City before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.