Logan City - Department of Light and Power

Utah Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.098
Solar Export Value Notes
2022: $0.098/kWh (see excess generation note for more info)
Net Excess Generation Notes

Excess generation is defined as the electricity exported to the Grid when energy generated at that given time was not used in the property/house.

When the customer’s distributed generation delivers excess generated power to the City’s electrical grid, the City will credit the Customer for the excess according to the rates set forth in the City’s “Distributed Generation Energy Metering Rate, Schedule 10”.

Total Installed Residential Solar (as of December 2021): 1644.7 kW

Currently at Step 1 Schedule.

Excess Energy Purchase Schedule:

Step 1: Up to 2500 kW installed: $0.098 (weighted average retail rate)

Step 2: 2500 kW installed: Weighted average wholesale cost + $0.035

Step 3: 3000 kW installed: Weighted average wholesale cost + $0.025

Step 4: 3500+ kW installed: Weighted average wholesale cost + $0.015 

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

AC Disconnect Location

  • Should be within 3 ft and in sight of the utility meter.
  • Other locations require Logan City Light & Power approval.
SLD Reqs
  • This document must indicate the location of the solar electric modules, inverter, batteries (if any), lockable disconnect switch, and point of connection with the utility system.
  • All electrical equipment specifications and calculations must be shown on the one-line. Any signs/labels should be shown with their respective calculated values on the one-line.
  • The installation address, current account number at that address, and the installer's name and telephone number must also be included. 
  • For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers
Install Reqs


Electrical Stamp Required
0
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Label Page Notes
  • Reference Utah Labels block
Rate Schedule Link
link
Website
link
Phone
(435) 716-9000

Other details

Restrict Inspection
0
Address ID
108122
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Logan City - Department of Light and Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.