Hyrum City Electric Department

Utah Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
TOU Utility
No
Post Solar Billing Method
Feed-in-Tariff
Solar Export Type
Fixed kWh
Solar Export Rate
0.04
Net Excess Generation Notes

Purchase all energy produced at $0.04/kWh

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Residential: 10 kW

Commercial: 50 kW

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-Disco-POI
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Site plans showing the physical layout of the Generating Facility and the location of associated structures and infrastructures such as buildings, streets, driveways, water ways, fences, the customer generating equipment and the City's associated distribution system equipment.

SLD Reqs

A single-line and three-line drawing showing the electrical relationship and descriptions of the significant electrical components such as the primary switchgear, secondary switchboard, protective relays, transformers, generator, circuit breakers, with operating voltages, capacities, and protective functions of the Generating Facility, the customers load, and the interconnection with the City's distribution system which is typically the City's transformer

For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20

A dedicated PV system production meter between the inverter and customer-provided AC disconnect switch is required

Install Reqs

Each GF installation must include a manually operated, lockable, disconnect switch with a visual break. The disconnect switch must be visible and accessible at all times by Hyrum City Electric Department. personnel to allow the GF to ben disconnected safely during maintenance or outage conditions. In the case of a PV system, this disconnect switch must be located next to the Hyrum City Electric Department electric meter. Thedisconnect switch shall be permanently labeled with text indicating that the switch is for the GF. The labeling shall also clearly indicate the open and closed position of the switch. The disconnect switch must be located on the output or load side of the GF such that the entire GF can be isolated from Hyrum City Electric Department distribution system. If the site contains several generators, a single disconnect switch may be used providing its rating is sufficient for all generators and opening it produces a visible open point between all generators and the Hyrum City Electric Department system.

Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(435) 245-6033

Other details

Revision Required
No
Mod Swap Requires Planset
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Hyrum City Electric Department before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.