Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Heber Light & Power

Utah Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Net Excess Generation Notes

The Company shall deduct from the Customer’s energy usage in kWh the Excess Energy produced by the Net Metering Facility and delivered to the Company’s system. The Customer shall not be entitled to any other credit or adjustment and shall pay all other charges associated with the Service provided to the Customer. In April of each year, the Company shall pay the Customer for any unused Excess Energy from the period since the last reconciliation computed at the Rate per kWh that the Company charges the Customer for retail Service at the Service Address. The Rate does not include energy or sales tax.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
90
System Size Restriction Type
Percent
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Has a generating capacity that does not exceed the lesser of:

  • 25 kW
  • 90% of the customer's average energy usage during the prior 2 years or the Company's estimate of the annual usage based on the size and type of Service
  • the capacity limitations of the Company's system or the circuit to which the Net Metering Facility shall be attached
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Production Meter shall be located not less than 5ft from the Service Meter.

the disconnection switch is accessible to the Company at all times, without assistance from the Customer or other non-Company personnel.

SLD Reqs

Production Meter Required

Inverter -> PM -> ACD -> POI

Install Reqs

Prior to designing the system, please check solar eligibility of the customer's address: https://www.heberpower.com/distributed-generation

  • Click the search box and type in the address, the result will be the "Feeder Circuit Name"
  • Scroll down and search for the "Feeder Circuit name", once you have found it, select it so you'll know if there's still capacity for solar
  • If there's no capacity, project will not be able to move forward
Label Page Notes

Reference Utah Labels block

Rate Schedule Link
link
Website
link

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
0
Address ID
247274
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Heber Light & Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.