City of Santa Clara, UT
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the energy supplied by the City exceeds the electricity generated by the Customer and fed
back to the City during the billing period, or any portion thereof, then the customer shall be
billed for:
- i. The net energy supplied to Customer by the City’s electric distribution system;
- ii. The appropriate customer base charge paid by other customers of the City in the same rate class;
- iii. The monthly Solar Reliability Charge as described in Exhibit B.
If the energy generated by Customer and distributed back to the City’s electric distribution
system during the billing period, or any portion thereof, exceeds the energy supplied to the
Customer by the City’s electric distribution system, then the customer shall be:
- i. Billed for the appropriate customer service charge as other customers of the City in the same rate class;
- ii. Credit for the net excess kWh’s generated during the billing period at the Renewable Power Rate as described in Exhibit B, with this kWh credit appearing on Customer’s bill for the following billing period.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 8
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20
- Website
- link
- Phone
- (435) 673-6712
Other details
- Restrict Inspection
- 0
- Address ID
- 188411
- Express Planset Eligible
- Yes