SPEC - Southern Plains Electric Cooperative

Texas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Solar Export Rate
0.81861
Net Excess Generation Notes

Net-metering members are defined as members who have placed a type of distributed generation which is no greater than 50 kW behind the Cooperative’s meter. A member qualifying for this rate will receive credit in kWh

generated against kWh consumed in one billing period. Kilowatt-hour credits will only offset up to the amount of kWh consumed in each billing period. All other applicable charges will be billed

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 50kW

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

Temporary Disconnect Reconnect Process (TDR) The installer can call in to our member service reps and request a temporary disconnect any time.

TDR - Who to Contact Member Service

TDR - Applications/Documents Req

TDR - ETA of notice required for request 24 hours

TDR - Who can schedule? Does not matter

TDR - ETA of Utility Scheduling TDR

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Plans Sample Attached

SLD Reqs

Visible, Lockable, Labeled AC Disconnect to be located within 10' of utility meter.

Placards

Placard to be placed on meter showing all equipment on the home

Equipment Approvals
California Energy Commission
Website
link

Other details

Restrict Inspection
0
Address ID
378287
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with SPEC - Southern Plains Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.