SHEC - Sam Houston Electric Co-op
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Net metering is allowed for systems up to 15 kW or less
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Placards
Requires “Engraved Placards” for anything Outside so modules, Disconnect, Inverter, etc. if they are outside they need to be Engraved Placards, NOT sticker Placards. Anything Inside, so Inside home or garage or inside the MSP can be Sticker Placards.
- Rate Schedule Link
- link
- Website
- link
- Phone
- (936) 327-5711
Other details
- Restrict Inspection
- 0
- Address ID
- 111754
- Express Planset Eligible
- Yes