SBEC - San Bernard Electric Co-op, Inc
Net metering & export
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Value Notes
- 0.032258
- Net Excess Generation Notes
Determination of billing shall be accomplished by interconnection through a multi-channel meter or two meters with one measuring all energy supplied by the Cooperative and the other measuring all energy supplied by the Customer to the Cooperative.
For power produced in excess of on-site requirements, the Customer shall be credited by SBEC for KWH that flowed to the SBEC power grid at the avoided cost of the purchased power.
Avoided Cost is calculated and shown on the customer’s bill or invoice and listed as the G & T (Generation and Transmission) Charges on their specific rate.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Site Plan not required to submit to utility
- SLD Reqs
One-Line Diagram. The diagram shall include at a minimum, all major electrical equipment that is pertinent to understanding the normal and contingency operations of the DG Interconnection Facilities, including generators, switches, circuit breakers, fuses, protective relays and instrument transformers.
The Member shall install a visible load break disconnect switch at the Member’s expense and to the Cooperative’s specifications.
The switch will be located so as to be readily accessible to Cooperative personnel in a location acceptable to both the Member and Cooperative
- Install Reqs
* The Member shall install a visible load break disconnect switch at the Member’s expense and to the Cooperative’s specifications.
* The switch will be located so as to be readily accessible to Cooperative personnel in a location acceptable to both the Member and Cooperative.
- Rate Schedule Link
- link
- Website
- link
- Phone
- Main: (979) 865-3171
Other details
- Restrict Inspection
- 0
- Address ID
- 108147
- Express Planset Eligible