PHEC - Panola-Harrison Elec Coop, Inc

Texas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04
Solar Export Value Notes
value changes every month
Rebates Offered
No

Interconnection & taps

Approval Req To Install
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
20
System Size Restriction Type
DC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Recommended offset is at 100% - Any transformer upgrade will be member's responsibility OR system will need to be downsized.

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

A manual lockable disconnect shall be installed between the Member’s Installation and the PHEC Distribution System.

SLD Reqs

Line side tap conductors must end in a breaker or fuses in mlo in the panel

Electric Service Reqs


Install Reqs

Output<20Kw

A manual lockable disconnect shall be installed between the Member’s Installation and the PHEC Distribution System.

Rate Schedule Link
link
Website
link
Phone
(903) 935-7936
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with PHEC - Panola-Harrison Elec Coop, Inc before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.