Pentex Energy

Texas Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed1
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.0517
Net Excess Generation Notes

No net metering shall be used. The type of metering to be used shall be specified at the solediscretion of the Cooperative. The metering shall provide data so the Cooperative can determine for each billing period the energy supplied to the Member by the Cooperative and the energy supplied to the Cooperative by the Member.

The Cooperative shall pay the Member on a monthly basis for the energy supplied by the Member to the Cooperative. The rate paid by the Cooperative shall be the Cooperative’s avoided cost.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
0
Tap Criteria
  • Line side taps are allowed but ONLY utilizing Polaris taps and ONLY in a main breaker enclosure or the main service panel
  • NO vampire clips, B-Taps, or meter adapter lugs allowed
  • We cannot tie into the utility meter can
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
Yes
Meter Spot Process
  • The customer MUST call the utility for the disconnect & reconnect. The utility would prefer a 3 day notice for a D&R, but will allow it to be called in the day before
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

The diagram shall include at a minimum, all major electrical equipment that is pertinent to understanding the normal and contingency operations of the DG Interconnection Facilities, including generators, switches, circuit breakers, fuses, protective relays and instrument transformers.

Install Reqs

The Member shall install a visible load break disconnect switch at the Member’s expense and to the Cooperative’s specifications. b) The switch will be located so as to be readily accessible to Cooperative personnel in a location acceptable to both the Member and Cooperative.

Placards

Signage shall be placed by the Cooperative at the Member’s expense and located at the disconnect indicating the purpose of the switch along with contact names and numbers of both the Member and the Cooperative.

Equipment Approvals
California Energy Commission
Website
link
Phone
(940) 759-2211

Other details

Restrict Inspection
0
Address ID
717873
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Pentex Energy before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.