Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Nueces Electric Cooperative, Inc.

Texas Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Solar Export Type
Other
Net Excess Generation Notes

Member’s chosen retail provider will purchase no output from the generating installation while allowing the Member to use the output to offset the Member 's total consumption, with the Member 's meter(s) modified to prevent reverse metering;


OR


Member’s chosen retail provider will purchase the output of Member 's generating installation as measured by a second meter which records the output while charging the Member for the Member 's consumption. Member must contact their chosen retail provider to execute this option. If the option of selling power to the Cooperative is exercised, there will be, in addition to the minimum monthly bill requirements under applicable service rate schedule(s), a customer service charge of $12.00 per month for metering and billing 

Rebates Offered
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
www.nueceselectric.org
Phone
(361) 767-7305

Other details

Restrict Inspection
0
Address ID
121112
Express Planset Eligible
Yes