Navarro County Electric Cooperative, Inc
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- No
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
Cooperative shall pay Member for the “kWh Received” from the Member’s DG System (energy received by the Co-op’s Distribution System) at the “Avoided Cost of Generation Rate” (ACGR). The ACGR is determined by the current fixed shape contract price for energy purchased by the Cooperative from its wholesale electric energy provider(s). Cooperative reserves the right to amend the ACGR at any time.
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 20 kW AC (residential).
System can be installed over 20 kW but less than 50 kW AC but will require a thorough interconnection/engineering study that will be paid by the contractor.
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Website
- link
- Phone
- (800) 771-9095
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes