Navarro County Electric Cooperative, Inc

Texas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Net Excess Generation Notes

Cooperative shall pay Member for the “kWh Received” from the Member’s DG System (energy received by the Co-op’s Distribution System) at the “Avoided Cost of Generation Rate” (ACGR). The ACGR is determined by the current fixed shape contract price for energy purchased by the Cooperative from its wholesale electric energy provider(s). Cooperative reserves the right to amend the ACGR at any time. 

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 20 kW AC (residential).

System can be installed over 20 kW but less than 50 kW AC but will require a thorough interconnection/engineering study that will be paid by the contractor.

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Website
link
Phone
(800) 771-9095

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Navarro County Electric Cooperative, Inc before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.