Mid-South Electric Co-op
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
1:1 buy-back for each kWh produced in excess of the home's needs. Mid-South will not cut a check to a member for over-production. It is crucial the system be as close to net zero as possible.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- AC Disconnect must be labeled on the one-line diagram as a fusible disconnect. (No matter the POI, AC disconnect must be fused)
- Synergy requires the Single Line Diagram to be stamped by a Licensed Engineer in the state of TX
-The line design must be stamped, signed, and dated by a Professional Engineer (PE) that is licensed in the state of Texas. According to Texas Administrative Code, Title 22, Part 6, Chapter 37, Subchapter B, Rule 137.33, the PE’s signature and date cannot obscure the engineer's name or license number in the seal.
- Electric Service Reqs
- Production meter not required
- The main disconnect for the solar array to be a fused disconnect.
- Install Reqs
- Fuse size from drawing must match what is in the field_.
- Electrical Stamp Required
- 1
- Website
- link
- Phone
- (936) 825.5100
Other details
- Restrict Inspection
- 0
- Address ID
- 108100
- Express Planset Eligible
- Yes