Medina Electric Cooperative, Inc.
Net metering & export
- Net Metering Allowed
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Value Notes
- link
- Net Excess Generation Notes
Members generally use this energy to meet their electric power needs, but excess power may be sold back to Medina EC at the avoided cost rate. Members who do sell back excess power will see it on their bill as a Distributed Generation Credit.
If the output of the Producer’s generating installation is to be purchased by the Cooperative, it will be measured by meters as required for the metering option chosen by the producer. Any necessary meter(s) or meter modification in addition to one standard service meter will be installed, maintained and operated by the Cooperative at the Producer’s expense. A connection will be provided for the meter(s) at the Producer’s expense in a location that as acceptable to both the Cooperative and the Producer. The Cooperative may, at its own expense, supply, install and maintain load research metering for the purpose of monitoring and evaluating
the Producer’s generating installation.
The metered output of Producers generating installation will be read by the Producer and, at the election of the Cooperative, accumulated or monthly readings may be checked at least monthly by representatives of the Cooperative.
Determination of billing shall be accomplished by interconnection through two meters, with one measuring all energy supplied by the Cooperative and the other measuring all energy supplied by the Producer, or through a single meter with multiple registers, with one measuring all energy supplied by the Cooperative and the other measuring all energy supplied by the Producer. During each billing period, the Producer shall be compensated for energy supplied by the Producer, if any, at the Cooperative’s avoided wholesale power cost as defined in Section 7(b).
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Maximum of 10MW
Additional note:
If an interconnection study is required, the member will be required to compensate Medina EC for the cost of the study.
If system improvements or lines extensions are required, the member will be required to pay the cost of those.
If the system is larger than 700 kW, South Texas Electric Cooperative will also require a separate application and fee for an interconnection study.
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Website
- www.medinaec.org/
- Phone
- (866) 632-3532
Other details
- Restrict Inspection
- 0
- Address ID
- 121104
- Express Planset Eligible
- Yes