Lamar County Electric Cooperative Association

Texas Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Solar Export Type
Avoided Cost
Net Excess Generation Notes

Our typical solar billing policy is Delivered Only, meaning the member is only billed for what they use from the utility.

The generation is not included in the billing equation.

 

However - we do offer reimbursement for generation at Avoided Cost.

In this case, the member is billed retail value for their load & reimbursed wholesale value for their generation.

 

It is the member’s preference for their billing choice. 

Rebates Offered
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

line side tap conductors must end in a breaker or fuses not in mlo lugs in the panel.

Website
link
Phone
(903) 784-4303

Other details

Restrict Inspection
0
Address ID
121083
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Lamar County Electric Cooperative Association before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.