Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Jasper-Newton Electric Cooperative, Inc.

Texas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Total kWh will be netted at the end of the monthly billing period (kWh supplied by the utility - kWh generated/sent back to the grid from the customer's facility). Any excess kWh will be zeroed out and will not be credited or rollover. 

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

NEM is only available for projects with 15 kW AC or less. Anything over 15 kW AC will be under Feed-In-Tariff

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
www.jnec.com
Phone
(409) 423-4076

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
121080
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Jasper-Newton Electric Cooperative, Inc. before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.