Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Total kWh will be netted at the end of the monthly billing period (kWh supplied by the utility - kWh generated/sent back to the grid from the customer's facility). Any excess kWh will be zeroed out and will not be credited or rollover. 

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

NEM is only available for projects with 15 kW AC or less. Anything over 15 kW AC will be under Feed-In-Tariff

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
www.jnec.com
Phone
(409) 423-4076

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes