Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

GUS - Georgetown Utility Systems

Texas Utility Interconnection & net metering rules
Net Metering Allowed1
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Utility does not allow system size above 10kW

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs
  • Surge protection device required in the MSP (similar to AE) for the Lightning Arrester
  • The Neutral must be isolated in the Disconnect and Meter Socket with Polaris tap or isolated neutral block.
  • Two disconnects are required. One rated for DC and one rated for AC.
Install Reqs

The Neutral must be isolated in the Disconnect and Meter Socket with Polaris tap or isolated neutral block.

The actual metering equipment required, its voltage rating, number of phases and wires, size, current transformers, number of input and associated memory is dependent upon the type, size and location of the electric service provided. This metering is based on GUS rates and standards.

Placards

Phenolic Placard Black on Yellow (See attached)

Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Electrical Diagram Notes

All Jobs [VLLD is to be within 10 feet of existing Revenue Meter]

Website
link
Phone
(512) 930-3640

Other details

Restrict Inspection
0
Address ID
141777
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with GUS - Georgetown Utility Systems before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.