COL - City of Livingston

Texas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Solar Export Type
Other
Net Excess Generation Notes

If the premises uses more city provided electricity than the DER system produces within a single billing month, the customer shall pay for the net kWh of electricity at the current standard per kWh rate charged by the city to residential customers. If the DER system produces more electricity than city provided electricity within a single billing month, no purchase of excess electricity shall be made by the city, nor any credit given to the customer for such excess electricity produced by the DER system.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Site Plan Reqs


Electrical Stamp Required
0
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(936) 327-4311

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
0
Address ID
934965
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with COL - City of Livingston before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.