City of Burnet

Texas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Other
Solar Export Value Notes
Exported kWh @ $0.00
Net Excess Generation Notes

Energy will go to the customer's property first, any excess kWh generated (exported to the grid), will not be credited.


In no event, shall the City pay the Small Generator for electricity produced by the Small Generator. 

Rebates Offered
No
Deregulated
No
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 10 kW AC or DC

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

ESID Num Req SLD 3LD
No
Website
link
Phone
(512) 756-2402

Other details

Revision Required
No
Mod Swap Requires Planset
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Burnet before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.