City of Brownfield

Texas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
Post Solar Billing Method
Feed-in-Tariff
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.032
Solar Export Value Notes
Based on previous 12 months average
Net Excess Generation Notes

City of Brownfield will purchase from Customer, and Customer will sell exclusively to City of Brownfield the electrical output made available to City at the point of delivery from the DG system. Electrical output shall mean the total amount of electricity generated by the DG System less any losses in transforming or transmitting such electricity to City of Brownfield. The point of delivery to City of Brownfield for electric power generated by the DG System shall be at Point of Interconnection. During the term of this Agreement, Customer shall exclusively purchase from City of Brownfield its requirements of electric energy above the amounts generated by the DG system.

Rebates Offered
No

Interconnection & taps

Approval Req To Install
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Max system size: 25kW

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Brownfield before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.