Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Bartlett Electric Cooperative, Inc.

Texas Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.0481
Solar Export Value Notes
May change without prior notice
Net Excess Generation Notes

All generation from the DG system will be recorded by the installed DG meter, purchased at $0.0481 per kWH and applied as a credit to the following month’s bill.

Rebates Offered
0
Deregulated
1
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
1
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Bartlett Electric does not allow systems above 20 kW AC

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Electrical Diagram Notes

Safety Disconnect -- A Renewable DG Producer shall install, at Producer’s expense, inverters with specifications and test standards UL 1741-1999 (or latest version) to provide isolation. In addition, a main disconnect switch will be installed by the Producer to provide a means of disconnection.

Website
www.bartlettec.coop
Phone
(254) 527-3551

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
0
Address ID
121028
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Bartlett Electric Cooperative, Inc. before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.