Winnsboro Electric Department

South Carolina Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
TOU Utility
0
Post Solar Billing Method
Net Metering
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Placards
Warning Label: Customer will install and maintain a permanent warning label in a conspicuous place in close proximity to the electric meter or on the meter base to notify the Town personnel that there is a generator installed on the load side of the meter. The warning label shall not be placed in a location that would interfere with the ability of the Town personnel to read the electric meter. Customer shall also place a warning label on the Isolation Device. The Town will provide the warning labels to Customer. The warning labels must be in place before the Generator can be interconnected with the Town's system.
Website
link
Phone
(803) 635-4745

Other details

Restrict Inspection
0
Address ID
155755
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Winnsboro Electric Department before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.