MPD Electric Cooperative, Inc
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Excess monthly generation is banked and rolled over monthly for 12 months (June to June). Any unused credits come June 1st will be depleted.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Maximum 20kW AC
- Offset Calc Tool
- PV Watts
Metering & disconnect
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
a one-line diagram showing the electrical design of the generating installation, depicting the necessary equipment for interconnection with the Cooperative's system.
One line diagrams of the installation stamped by licensed engineer
- Install Reqs
Utility Inspection Required: Yes
Meter is capable of bidirectionality, there is no need for a production meter. You will interconnect behind our meter therefore you are not required to use your own meter.
- Electrical Stamp Required
- 1
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
- Website
- link
- Phone
- (843) 665-4070
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 165432
- Express Planset Eligible
- Yes