Lynches River Electric Cooperative, Inc.
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
"We do allow residential solar connects here and currently offer a 1:1 Kwh bill credit for returned usage. Bear in mind that while we do currently offer that rate, we have initiated a rate study for the value of solar, and at some point, in the future (ETA unknown) the rate for all customers may change."
- Rebates Offered
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
SLD must show connection to meter and equipment (Standard)
- Placards
Warning Label: Customer will install a permanent warning label in a conspicuous place in close proximity to the electric meter or on the meter base to notify that there is a generator installed on the load side of the meter. The warning label shall not be placed in a location that would interfere with the ability to read the electric meter. Customer shall also place a warning label on the Isolation Device. Company will provide the warning labels to Customer.
Disconnect: The switch must be labeled “Generator Disconnect Switch”.
- Electrical Stamp Required
- No
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (843) 672-6111
Other details
- Revision Required
- Yes