Laurens CPW
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- No
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Value Notes
- On-Peak Energy $0.03874 Off-Peak Energy $0.02168
- Net Excess Generation Notes
All excess is metered thru a bidirectional meter and appears as a credit on the monthly bill, On-Peak Energy $0.03874
Off-Peak Energy $0.02168
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Electrical Stamp Required
- No
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
Other details
- Mod Swap Requires Planset
- No