City of Newberry (SC)

South Carolina Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Post Solar Billing Method
Export Rate
Net Excess Generation Notes

"Exported usage is counted on an hourly basis and credited at either the on- or off-peak hourly rates.


In the event that a given monthly credit for excess customer-owned renewable generation exceeds the total billed amount for Customer’s consumption in any corresponding month, then the excess credit shall be applied to the subsequent month’s bill. Excess energy credits so produced shall accumulate and be used to offset Customer’s energy consumption bill for a period of not more than twelve (12) months. At the end of each calendar year, unused excess credits shall be paid by Utility to the Customer.


Metering shall be performed by a single meter capable of registering the flow of electricity in two directions (delivered and received) to determine the customers' net energy consumption."

Rebates Offered
No
Deregulated
No
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

25kW max residential, 100% of contracted load or 1,000kW max- non-residential

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Install Reqs

Customer shall install a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the CRG system and any Customer wiring connected to Utility’s electric system such that back feed from the CRG system to Utility’s electric system cannot occur when the switch is in the open position. The manual disconnect switch shall be mounted separate from the meter socket on an exterior surface adjacent to the meter. The switch shall be readily accessible to Utility and capable of being locked in the open position with a Utility padlock. When locked and tagged in the open position by Utility, this switch will be under the control of Utility.

Equipment Approvals
California Energy Commission
Website
link
Phone
(803) 321-1018

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes