LUMA (PR)
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredNo
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- N/A
- Net Excess Generation Notes
- Customer net excess generation (NEG) is carried over as a kilowatt-hour (kWh) credit to the following month, but NEG credit is limited to a "daily maximum" of 300 kWh for residential customers and 10 megawatt-hours (MWh) for commercial customers.
- Customers with excess credits remaining at the end of a 12-month period (ending in June) will be compensated as follows: 75% of the excess credits will be purchased by LUMA at a rate of $0.10 per kWh or "the amount resulting from the subtraction of the adjusted fuel fee based on the variable costs incurred by the public corporation exclusively for the purchase of fuel and energy, from the total price charged by the public utility to its customers, converted into kilowatt-hours, whichever is greater".
- The remaining 25% will be granted to LUMA to distribute as a credit or reduction applied to the electricity bills of public schools.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- Transformer upgrades can be common due to limited infrastructure capacity. Please check the hosting capacity map: https://experience.arcgis.com/experience/99811dd66276465bb687a7fc8cc8cbe0/
- System Offset Notes
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- No
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Requirements
- Identify the 'Rapid Shutdown' on the site plan.
Electrical Stamp Process
- EE stamp required for all projects
- All pages, excluding removed pages
- Use Right Angle Engineering
- Electrical Stamp, Digital
- Leave STAMP task under your name and in To Do
- SLD Reqs
- AC Disco or RSD required post PV. No ESS (battery) disco required.
- EE stamp required. See Site Plan Requirements
- Placards
The following pages should be removed from the plans
- Electrical Stamp Required
- 1
- Equipment Approvals
- Other
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Site Plan Notes
No specific site plan notes required.
- Label Page Notes
No specific label page notes required.
- Cover Page Notes
We must show specific information from the Utility Bill on the Title Block of the plans
- Service Address: This can be found via "Direccion del servicio" field under "Informacion del Medidor Y Del Servicio" of Utility BIl (page 3)
- Account Number: This can be found via "Su numero de cuenta" field on the top of the first page of the Utility Bill.
- Account Holder: This can be found on 1st page of the Utility Bill (above mailing address)
- If Utility Bill isn’t available in Lightspeed, block Plans task with ticket to SOW Management team
Note Latitude and Longitude (and XY coordinates) on Cover Page in the Vicinity Map
- This can be pulled from "ID Localizacion” from Utility Bill
- XY can be found via this website https://gis.jp.pr.gov/mipr/index.html?o=fromGeoloc
Notate this calculation for AC System Size on title block
- Peak output of 300 x Modules = x.xxx AC
- Peak output of 300 x 12 (inverters) = 3.600 AC
- Electrical Diagram Notes
- Note if the connection is 'Supply Side' or 'Load Side'.
- Note on SLD under MSP [NO OTHER LOADS PRESENT IN THIS MAIN PANEL]
- Website
- link
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 0
- Address ID
- 3421975
- Express Planset Eligible
- Yes