West Penn
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Excess energy received from the customer is credited to the customer's account at the applicable generation component of the customer's rate schedule.
- Rebates Offered
- 1
- Deregulated
- 1
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 0
- Tap Criteria
No Taps allowed in Meter Can.
Meter Can cannot be used as a raceway
Disconnect must be rated as a service disconnect when tapping.
(PG 11 SLD W LST https://firstenergycorp.com/content/dam/feconnect/files/retail/Customer-Interconnection-Guide-Single-Phase.pdf )
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
100% of the xfmr rating. Above that the transformer will need to be upgraded at the customer’s expense
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Overall property layout and street access including North arrow orientation and the nearest cross street in each direction. (Indicate direction of nearest cross street if impractical to show on drawing).
Ground mounted installations must show clearances and details of surrounding structures especially how they cross the Company's facilities. The route and length of the electrical connection to the premise is also required.
Location of the DER AC disconnect meeting the requirements of the NEC - for self-contained metering locations.
Location of the DER utility required AC visible break disconnect - for metering locations utilizing instrument transformers.
Location of generation, inverter, storage and associated electrical equipment.
Location of service transformer.
- SLD Reqs
ALL Jobs
Please indicate DC and AC ratings as appropriate.
Please indicate AC rating of the inverter.
Identify the make and model of the disconnect switch and note if it is lockable with a visible break when required.
Identify connection to Customer’s electrical system.
Identify utility meter, inverter and/or associated generation and storage (battery) equipment.
PV - INV - AC DISCO - PV BREAKER - MSP
No attachments by the customer or the customer’s agent are permitted to Company-owned meters, meter circuits, or ancillary meter devices.
- Any adapter placed between the revenue meter and meter socket.
- Attachments or connections to the potential or current circuits of transformer-rated revenue meters.
- Any connection inside the meter socket.
BATTERY
AC Disco required to Isolate Battery
- Electric Service Reqs
The Customer DER shall be UL 1741 / UL1741SA certified as a “Grid Support Interactive Inverter”, or a “Grid Support Utility Interactive Inverter” utilizing IEEE 1547- 2003, or IEEE 1547a-2014 compliant settings with all grid support functions disabled
- Install Reqs
DER installed at a single phase electric service location utilizing a self-contained company meter (usually 400A service size, or less), shall have a disconnect switch meeting the requirements of the NEC between the Company meter and the DER PoC. The switch shall be clearly marked, "Generator Disconnect Switch”, with permanent 3/8 inch or larger letters. The preferred location of the switch is outside the building in the immediate vicinity of the electric meter to facilitate access by Company personnel.
- Rate Schedule Link
- link
- Website
- link
- Phone
- (800) 720-3600
Other details
- Restrict Inspection
- 0
- Address ID
- 189400
- Express Planset Eligible
- Yes