St. Clair Borough Electric Light Department (PA)

Pennsylvania Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes
  • If the customer generates more energy than consumed during a monthly billing cycle, the customer shall receive an energy credit in kilowatt hours for the next billing month. Monthly credit shall be applicable to energy only. At the end of the 12 months, the Borough will purchase any excess generation at $0.0385/kWh
  • If a member receives a total yearly credit of more than $600, they will receive a 1099, and will have to pay tax on it.
Rebates Offered
0
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Tap Criteria

Follow AHJ guidelines on tap allowances

Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes


Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Site Plan Reqs

Standard - Follow AHJ Requirements

SLD Reqs

Standard - Follow AHJ Requirements

Electric Service Reqs

AC Disconnect Required

  • Shall be visual break
  • Shall be accessible to the utility company
  • Shall be capable of being locked in the open position
Placards

Generation Site Warning Label:

  • Must be posted in a conspicuous place on the electric meter or meter box to notify that there is a generator source installed on the load side of the meter
  • Warning label shall not be placed in a location that would interfere with the ability to read the electric meter
  • Must be placed before the generation is connected
Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0

Other details

Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with St. Clair Borough Electric Light Department (PA) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.