PCLP - Pike County Light & Power Company

Pennsylvania Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The Company shall credit customer-generators who are EGS customers for each kilowatt-hour of electricity produced at the Company’s unbundled distribution kilowatt-hour rate. The distribution kilowatt-hour rate credit shall be applied monthly against kilowatt-hour distribution usage. If the customer-generator supplies more electricity to the electric distribution system than the Company delivers to the customer-generator in any billing period, the excess kilowatt hours shall be carried forward and credited against the customer-generator’s unbundled kilowatt-hour distribution usage in subsequent billing periods until the end of the year when all remaining unused kilowatt-hour distribution credits shall be zeroed-out. Distribution credits are not carried forward into the next year.

Rebates Offered
Yes
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Service is available upon request to renewable customer generators on a first come, first served basis so long as the total rated generating capacity installed by renewable customergenerator facilities does not adversely impact service to other Customers and does not compromise the protection scheme(s) employed on the Company’s electric distribution system and so long as the total rated generating capacity of the applicant customer, in combination with existing net metering customers, does not exceed 110% of the Company’s lowest base demand load capacity.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
link
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with PCLP - Pike County Light & Power Company before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.