Milton-Freewater City Light & Power

Oregon Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If a Customer-Generator feeds back to the City more electricity than the City supplies the Customer-Generator during a billing period, the City shall charge the Service Charge for that rate class but there will be no kWh charge for that month. The City will record the Customer-Generator’s excess kWh generated. Any excess kWh recorded will be rolled over to the following billing period. In March of each year, the prior 12 months of Customer-Generator’s kWh will be reviewed. If applicable, those who generated more kWh than the City provided to them - will be issued a payment equal to the excess kWh generated multiplied by the City’s Avoided Cost Rate. ($0.0350 / kWh)

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

25 kW AC max

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Rate Schedule Link
link
Website
link
Phone
(541) 938-5531

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
6189945
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Milton-Freewater City Light & Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.