Lane Electric Cooperative

Oregon Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the energy supplied to the Cooperative in a given billing cycle is greater than the energy purchased from the Cooperative, the member shall be billed for the Page 4 of 12 appropriate basic charges and shall be credited for the excess kilowatt-hours generated during the billing period in subsequent, serial billing periods.


For the billing cycle ending in March of each year, any remaining unused kilowatt-hour credit accumulated during the previous year shall be valued based upon the cost of wholesale electric power purchased by the Cooperative. The valuation shall include energy charges, capacity charges, and any other applicable charges. The Cooperative may average the energy charges, capacity charges, and any other applicable charge into one rate per kWh and is separately stated in Lane Electric’s Rate Schedule GS-1. The value of any excess energy generated shall be credited to the member’s account or to the Cooperative’s low-income energy assistance program, as determined by the member.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0
System Offset Notes

There are no designated size requirements but the net metering policy is set up to limit returns on systems that are sized larger than the annual consumption of the facility. Also, upon initial review of the project, if it is found to be too large for the supporting infrastructure (i.e. megawatt array tied to a 200 Amp service) the application will not be approved without further consultation with Lane Electric.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

TDR Process: Just call the office and request one

TDR - Who to

TDR - Applications/Documents Req: N/A

TDR - ETA of notice required for request: 48 hours

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Just a simple one-line diagram containing major system components, wiring to the meter, grounding and any special notes.


For solar electric facilities larger than 10 kW in nameplate capacity, the Facility shall have a manual disconnect switch that is clearly visible from the meter and is accessible by the Applicant and the Cooperative at all times. The switch shall provide a visible open between the Facility and the Cooperative’s source. The manual disconnect switch shall be lockable in only the open position

Equipment Approvals
California Energy Commission
Website
link

Other details

Restrict Inspection
0
Address ID
282053
Express Planset Eligible
Yes