Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the electricity generated by the Customer during the billing period, or any portion thereof, exceeds the electricity supplied by the Utility, then the Customer shall be: billed for the appropriate customer service charge as other customers of the Utility in the same rate class; and credited for the net excess kilowatt-hours generated during the billing period, with this kilowatt-hour credit appearing on Customer’s bill for the following billing period. On March 31st of each calendar year, any remaining unused kilowatt-hour credit accumulated by the Customer during the previous year (April 1 through March 31) will be paid to the Customer-Generator for such electric energy at UEC’s avoided cost rate. Customer-Generator shall pay any amount owing for electric service provided by the Utility in accordance with applicable rates and policies. 

Rebates Offered
Yes
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 100% offset or 25 kW AC (whichever is less)

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None,None

Plans & docs

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(541) 289-2000

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes