Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Nameplate generating capacity of not more than twenty-five (25) kilowatts per meter

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

"Section 230.67 of the new 2020 NEC requires the installation of a surge-protective device (SPD) for all dwelling unit service entrances. New and replaced electrical equipment and systems must incorporate Type 1 or Type 2 SPDs. Type 1 surge protective devices can be installed before the main disconnect in the load center, at the meter enclosure or on the load side of the main circuit breaker. Type 2 surge protective devices can only be installed on the load side of the main disconnect, attached directly to a circuit breaker. Often, new construction will install Type 1 surge protectors, while renovations will install Type 2 surge protectors, but both types will satisfy the new requirements.

As of July 1, 2021, this state uses the 2020 NEC."

Placards

State of Oregon Standards

Equipment Approvals
California Energy Commission
Website
link
Phone
(541) 573-2061