Consumers Power

Oregon Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

The net excess energy generated during the billing period by the Customer and supplied to the Cooperative’s system may be valued based upon the avoided cost of wholesale electric power purchased by the Cooperative. The valuation shall include energy charges, capacity charges, and any other applicable charges. The value shall be the avoided cost which shall be determined annually by dividing the total cost of purchased power by the total energy (kWh) purchased. The net excess energy generated during the billing period by the Customer and supplied to the Cooperative’s system may be credited to the Customers’ account at this rate.


All Customer net metering accounts shall be cleared (i.e., returned to a $0.0 balance) once per calendar year. For each 12-month period ending in April, any remaining credit in the Customers’ accounts shall be refunded directly to the respective Customer.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Nameplate generating capacity of not more than twenty-five (25) kilowatts per meter

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

TDR Process: They will need to call in to set up a time with our customer service department. . Customer service would arrange everything with you on this.

TDR - Who to

TDR - Applications/Documents Req N/A

TDR - ETA of notice required for request 48 hours

TDR - Who can schedule? Does not matter

TDR - ETA of Utility Scheduling TDR N/A

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Show Utility Meter on site plan. If UM is part of an all-in-one MSP, plans should still indicate the location of the UM
SLD Reqs

See SLD Sample

Electric Service Reqs

Transformer Upgrade Requirements: This is highly variable. They can of course downsize and a revised application would have to be submitted. Before a fee is paid we would notify you of your options.

Install Reqs

CPI requires a readily accessible, lockable manual disconnect switch at the point of delivery for all systems greater than 30 amps.

Placards

State of Oregon Requirements

Website
link
Phone
(800) 872-9036

Other details

Restrict Inspection
0
Address ID
280661
Express Planset Eligible
Yes