City of Monmouth Power and Light
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
If the value of the electricity generated by the Customer exceeds the price of Customer's consumption at the standard rate and is distributed back to the CITY during the billing period, then the Customer shall be billed for the same customer service charge as are applied to other customers of the CITY in the same rate class and paid for the value of the electricity generated at the CITY's avoided cost.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Nameplate generating capacity of not more than twenty-five (25) kilowatts per meter
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- Situational
- Production Meter Criteria
- A production meter is not strictly required, but the Net Metering Agreement allows the City of Monmouth to install one at its discretion.
- Do not add one unless specifically requested by the utility .
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility AC Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
AC Disconnect must be within 10 ft of, and within sight of Utility Meter.
- Install Reqs
Customer shall furnish and install a switch capable of fully disconnecting and isolating the Customer's system from the Utility's.
- Placards
Provide permanent, durable signage as specified in the City's applicable interconnection standards.
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (503) 838-0722
Other details
- Restrict Inspection
- 0
- Address ID
- 284079
- Express Planset Eligible
- No