Central Electric Cooperative, Inc. (OR)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- N/A
- Net Excess Generation Notes
Net energy is the difference between the electricity supplied by Central Electric Cooperative, Inc. and the electricity generated by an eligible Customer-generator and fed back to Central Electric Cooperative, Inc.’s electrical system over the applicable billing period. Excess power generated shall be credited to the Customer-generator’s account at Central Electric Cooperative, Inc.’s prevailing “avoided cost.” This credit shall be used to offset future billings for electrical power consumed. All net-metering accounts shall be cleared (i.e., returned to a $0.00 balance) annually. For each twelve (12) month period ending in December, any remaining credit in the Customers-generator’s account shall be returned to the respective Customer-generators.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect
- Meter Spot Required
- 1
- Meter Spot Process
Temporary Disconnect/Reconnect (TDR) Process
- staff -
- Applications/Documents: None required
- Notice for Request: 48 hours
- Who Can Schedule: Anyone
- Utility Scheduling ETA: 2-3 business days
- Allowed Meter Adapter
- Tesla Backup Switch
Plans & docs
- SLD Reqs
- Show switchgear, transformers, and generation equipment.
- Include a brief description of how the generation operates, e.g.: Cogeneration, Closed-transition peak shaving, Open-transition peak shaving, Emergency power
- Install Reqs
Customer-Generator Disconnect Requirements
- Must be visible break type in a metal enclosure that can be padlocked.
- Manual pull lever at the electric meter is required.
- Placards indicating disconnect location are not accepted.
- Placards
- The visible disconnect shall be clearly labeled “Generation Disconnect” to inform CEC's line and substation personnel.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (541) 548-2144
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 600860
- Express Planset Eligible
- Yes