Tri-County Electric Cooperative (OK)
Net metering & export
- Net Metering Allowed
- 1
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.05294
- Net Excess Generation Notes
The energy generated by the member’s Distributed Generation Facility and delivered back to the Cooperative shall be credited to the member during the billing period at the Cooperative’s Avoided Cost, the energy generated by the member’s Distributed Generation Facility may be used to offset the member’s energy requirements at the time of generation
The DG Rider has a power cost adjustment applied. The tariff shall be increased or decreased by the amount, in cents or fraction thereof, by which the average cost of power/kWh purchased was paid to wholesale power suppliers during the previous month exceeds or is less than 5.2594 cents per kWh. TCEC (OK) DG Rider
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Tap Criteria
The Distributed Generation Facility must be connected on the member’s side of the TCEC retail meter (no direct connection to the TCEC distribution facilities is permitted)
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Electric Service Reqs
Follow NEC codes for ground/equipment clearances (per utility)
- Install Reqs
AC disconnect required
- Placards
Follow NEC codes for placards (per utility)
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
Other details
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 6368809
- Express Planset Eligible
- Yes